Across 4 days early this month, with a hand from Jason, I managed to cut the full width of the driveway, as well as the space for the turn around area I was planning.
All told:
- 3.5 days of work on site
- 3 chainsaw chains
- 500′ of new trail
- 3500 sqft of newly cleared area for parking
- Pulled over 40 stumps
- Cleared and leveled the entire entrance driveway, and spread 12 tons of gravel.
- Cleaned up the ground and stumps in the turn around area.



As well, I finally finished cutting the trail out to where I want to stage the event site, so now we can go exploring that area to see where it makes sense to potentially put things.



This month was definitely a heavy one in terms of development, finally getting the entire site layout explorable and ready for our future village. Being able to take something that was an hour of bushwhacking on my first trip in, and less than 4 months later, be able to walk all the way in in 6 minutes is a huge reward for all the work put in.

Thanks everyone who helped me get this far in the project!